FEED / Concept Study – CLV New Build

The ESD engineering team has supported over 50 CLV Front End Engineering Studies in recent years, for customers in Europe, Asia and USA. A concept vessel can be issued within days of start, and typical outputs include:

All designs are very sensitive to soft cable handling, and include the latest cutting edge thinking in the industry. Existing CLVs are referenced and technology is kept as similar as possible to current practice.

STBD-FWD-ISO
Plan View
PORT-AFT-ISO
Port Elevation
CLV New Build
CLV New Build
CLV New Build

Contact

Gavin Rippe
Managing Director
Energy System Design Ltd.

Gavin.rippe@energysd.co.uk

+44 7960 310400